35 niobium–tin superconducting coils have been manufactured as part of a fruitful collaboration with the company General Electric. They will be used in the 11 T dipoles for the HL-LHC
FASER, the Forward Search Experiment, has been installed in the LHC tunnel during Long Shutdown 2. It is currently being tested and will start taking data next year
CERN’s final-year apprentices obtained their diplomas in spite of the difficulties posed by the COVID-19 crisis; two of them received prizes from the "Union industrielle genevoise"
At LHC Point 4, a refrigerator that cools helium from room temperature to 4.5 K (-268.65 °C) has undergone major improvements in preparation for the HL-LHC